Global Data Center Construction Market Research Report Forecast to 2023

Data Center Construction Market Research Report, by Design Type (Electrical Construction, Mechanical Construction), Tier Type (Tier 1, Tier 2, Tier 3, Tier 4), Verticals (BFSI, IT & Telecommunication, Media & Entertainment, Oil & Energy, Public Sector) Global Forecast till 2023
Market analysis

A data center is a vast system of networked servers for the purpose of collection, distribution, and remote data storage by the companies. The advancement of the internet of things (IoT) and cloud technology has generated a huge amount of data that can dictate the transforming design of data centers. The demand and interest in the energy-efficient data centers are probably going to open up development opportunities for the market in the prospective years. This, therefore, is relied upon to drive the buy of low-heat radiating structure materials. Selection of greener strategies, for example, reuse of waste and evaporative cooling are probably going to help this pattern. However, high initial investments and expenses can go about as a market impediment. The global data center construction market is projected to expand at a growth rate of 9.04% CAGR during the forecast period 2018 to 2023.

Market segmentation

The global data center construction market is segmented on the basis of its design type, tier type, verticals, and regional demand. Based on its design type, the market includes electrical and mechanical construction. On the basis of its tier type, the market is bifurcated into tier 1, tier 2, tier 3, and tier 4. Based on its industry verticals, the data center construction market is divided into insurance (BFSI), media & entertainment, IT & telecommunication, oil & energy, financial services, banking, and public sector.

Regional Analysis

Geographically, the global data center construction market is divided into global regions like Europe, North America, Asia- Pacific, Middle East, LATAM, and Africa.

Major players

Structure Tone (U.S.), Jones Engineering Group (Ireland), AECOM (U.S.), HDR Architecture (U.S.), and Corgan Associates Inc. (U.S.), Holder Construction Group (U.S.), Turner Construction Company (U.S.), Arup Group (U.K.), among others are some of the major players in the global data center construction market.


1 Executive Summary
2 Market Introduction
2.1 Definition
2.2 Scope of the Study
2.3 List of Assumptions
2.4 Market Structure
3 Market Insights
4 Research Methodology
4.1 Research Process
4.2 Primary Research
4.3 Secondary Research
4.4 Market Size Estimation
4.5 Forecast Model
5 Market Dynamics
5.1 Introduction
5.2 Drivers
5.2.1 Rising number of IoT devices
5.2.2 Rapid installation of data center facilities
5.3 Opportunities
5.3.1 Adoption of green data center
5.4 Restraints
5.4.1 High initial investment cost
5.5 Value Chain Analysis
5.5.1 Original Equipment Manufacturers (OEMs)
5.5.2 System Integrators
5.5.3 Design type
5.5.4 Data Center End-Users
5.6 Porters Five Forces Model
5.6.1 Threat of New Entrants
5.6.2 Bargaining Power of Suppliers
5.6.3 Bargaining Power of End-Users
5.6.4 Threat of Substitutes
5.6.5 Intensity of Rivalry
6 Market Alerts
6.1 Impact Analysis of Emerging Technology
6.1.1 Edge Computing
7 Global Data Center Construction Market, By Design Type
7.1 Overview
7.1.1 Electrical Construction
7.1.1.1 UPS
7.1.1.2 Rack PDU
7.1.1.3 Generators
7.1.1.4 Transfer Switches
7.1.1.5 Others
7.1.2 Mechanical Construction
7.1.2.1 Cooling Solution
7.1.2.2 Racks
8 Global Data Center Construction Market, By Tier Type
8.1 Overview
8.1.1 Tier 1
8.1.2 Tier 2
8.1.3 Tier 3
8.1.4 Tier 4
9 Global Data Center Construction Market, By Verticals
9.1 Overview
9.1.1 BFSI
9.1.2 Healthcare
9.1.3 IT & Telecommunication
9.1.4 Media & Entertainment
9.1.5 Oil & Energy
9.1.6 Public Sector
10 Data Center Construction Market, By Region
10.1 Introduction
10.2 North America
10.2.1 U.S.
10.2.2 Canada
10.2.3 Mexico
10.3 Europe
10.3.1 Germany
10.3.2 U.K
10.3.3 France
10.3.4 Rest of Europe
10.4 Asia Pacific
10.4.1 China
10.4.2 Japan
10.4.3 India
10.4.4 Rest of Asia Pacific
10.5 Rest of the World
10.5.1 The Middle East & Africa
10.5.2 Latin America
11 Competitive Landscape
11.1 Competitive Landscape Overview
12 Company Profiles
12.1 AECOM
12.1.1 Company Overview
12.1.2 Financial Overview
12.1.3 Products/Service Offerings
12.1.4 SWOT Analysis
12.1.5 Business Strategy
12.2 Arup Group
12.2.1 Company Overview
12.2.2 Financial Overview
12.2.3 Products/Service Offerings
12.2.4 SWOT
12.3 Corgan Associates Inc.
12.3.1 Company Overview
12.3.2 Products/Service Offerings
12.3.3 Key Developments
12.3.4 Business Strategy
12.4 DPR Construction
12.4.1 Company Overview
12.4.2 Construction Projects
12.4.3 Key Developments
12.4.4 Business Strategy
12.5 Gensler
12.5.1 Company Overview
12.5.2 Products/Service Offerings
12.5.3 Key Developments
12.6 HDR Architecture
12.6.1 Company Overview
12.6.2 Products/Service Offerings
12.6.3 Key Developments
12.7 Page Southerland Page
12.7.1 Company Overview
12.7.2 Key Developments
12.8 Holder Construction Group
12.8.1 Company Overview
12.8.2 Products/Service Offerings
12.8.3 Key Developments
12.9 Jones Engineering Group
12.9.1 Company Overview
12.9.2 Projects Undertaken
12.1 Structure Tone
12.10.1 Company Overview
12.10.2 Key Developments
12.10.3 Business Strategy
12.11 Syska Hennessy
12.11.1 Company Overview
12.11.2 Key Developments
12.12 Turner Construction
12.12.1 Company Overview
12.12.2 SWOT Analysis
12.12.3 Business Strategy
13 Appendix
13.1 Discussion Blue Print

List Of Tables



TABLE 1 MARKET SYNOPSIS
TABLE 2 LIST OF ASSUMPTIONS
TABLE 3 U.S. H1 2017 DATA CENTER WHOLESALE MARKET FUNDAMENTALS
TABLE 4 NEW DATA CENTER PROJECTS ANNOUNCED IN THE U.S., 2016-2017
TABLE 5 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD BILLION)
TABLE 6 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD BILLION)
TABLE 7 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD BILLION)
TABLE 8 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD BILLION)
TABLE 9 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD BILLION)
TABLE 10 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY REGION, 2016-2023 (USD BILLION)
TABLE 11 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2016-2023 (USD MILLION)
TABLE 12 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 13 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 14 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 15 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 16 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 17 U.S.: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 18 U.S.: DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 19 U.S.: DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 20 U.S.: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 21 U.S.: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 22 CANADA: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 23 CANADA: DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 24 CANADA: DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 25 CANADA: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 26 CANADA: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 27 MEXICO: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 28 MEXICO: DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 29 MEXICO: DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 30 MEXICO: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 31 MEXICO: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 32 EUROPE DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2016-2023 (USD MILLION)
TABLE 33 EUROPE: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 34 EUROPE: DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 35 EUROPE: DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 36 EUROPE: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 37 EUROPE: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 38 GERMANY: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 39 GERMANY: DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 40 GERMANY: DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 41 GERMANY: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 42 GERMANY: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 43 U.K: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 44 U.K: DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 45 U.K: DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 46 U.K: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 47 U.K: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 48 FRANCE: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 49 FRANCE DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 50 FRANCE DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 51 FRANCE: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 52 FRANCE: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 53 REST OF EUROPE: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 54 REST OF EUROPE DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 55 REST OF EUROPE DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 56 REST OF EUROPE: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 57 REST OF EUROPE: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 58 ASIA PACIFIC DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2016-2023 (USD MILLION)
TABLE 59 ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 60 ASIA PACIFIC DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 61 ASIA PACIFIC DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 62 ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 63 ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 64 CHINA: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 65 CHINA DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 66 CHINA DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 67 CHINA: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 68 CHINA: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 69 JAPAN: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 70 JAPAN DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 71 JAPAN DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 72 JAPAN: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 73 JAPAN: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 74 INDIA: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 75 INDIA DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 76 INDIA DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 77 INDIA: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 78 INDIA: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 79 REST OF ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 80 REST OF ASIA PACIFIC DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 81 REST OF ASIA PACIFIC DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 82 REST OF ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 83 REST OF ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 84 REST OF THE WORLD DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2016-2023 (USD MILLION)
TABLE 85 REST OF THE WORLD: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 86 REST OF WORLD DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 87 REST OF WORLD DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 88 REST OF THE WORLD: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 89 REST OF THE WORLD: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 90 THE MIDDLE EAST & AFRICA: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 91 THE MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 92 THE MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 93 THE MIDDLE EAST & AFRICA: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 94 THE MIDDLE EAST & AFRICA: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)
TABLE 95 LATIN AMERICA: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016-2023 (USD MILLION)
TABLE 96 LATIN AMERICA DATA CENTER CONSTRUCTION MARKET, BY ELECTRICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 97 LATIN AMERICA DATA CENTER CONSTRUCTION MARKET, BY MECHANICAL CONSTRUCTION, 2016-2023 (USD MILLION)
TABLE 98 LATIN AMERICA: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016-2023 (USD MILLION)
TABLE 99 LATIN AMERICA: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016-2023 (USD MILLION)

List Of Figures



FIGURE 1 GLOBAL DATA CENTER CONSTRUCTION MARKET: MARKET STRUCTURE
FIGURE 2 NORTH AMERICA MARKET SIZE & MARKET SHARE BY COUNTRY (2017 VS 2023)
FIGURE 3 EUROPE MARKET SIZE & MARKET SHARE BY COUNTRY (2017 VS 2023)
FIGURE 4 ASIA-PACIFIC MARKET SIZE & MARKET SHARE BY COUNTRY (2017 VS 2023)
FIGURE 5 REST OF THE WORLD MARKET SIZE & MARKET SHARE BY COUNTRY (2017 VS 2023)
FIGURE 6 RESEARCH PROCESS OF MRFR
FIGURE 7 TOP DOWN & BOTTOM UP APPROACH
FIGURE 8 DRIVERS, OPPORTUNITIES AND RESTRAINT ANALYSIS OF GLOBAL DATA CENTER CONSTRUCTION MARKET
FIGURE 9 VALUE CHAIN: DATA CENTER CONSTRUCTION MARKET
FIGURE 11 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016 TO 2023 (USD BILLION)
FIGURE 12 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016 TO 2023 (USD BILLION)
FIGURE 13 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016 TO 2023 (USD BILLION)
FIGURE 14 GLOBAL DATA CENTER CONSTRUCTION MARKET, BY REGION, 2016 TO 2023 (USD BILLION)
FIGURE 15 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET SHARE, BY COUNTRY, 2016-2023 (USD MILLION)
FIGURE 16 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016 TO 2023 (USD MILLION)
FIGURE 17 NORTH AMERICA: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016 TO 2023 (USD MILLION)
FIGURE 18 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016 TO 2023 (USD MILLION)
FIGURE 19 EUROPE: DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2016-2023 (USD MILLION)
FIGURE 20 EUROPE: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016 TO 2023 (USD MILLION)
FIGURE 21 EUROPE: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016 TO 2023 (USD MILLION)
FIGURE 22 EUROPE: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016 TO 2023 (USD MILLION)
FIGURE 23 ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2016-2023 (USD MILLION)
FIGURE 24 ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016 TO 2023 (USD MILLION)
FIGURE 25 ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016 TO 2023 (USD MILLION)
FIGURE 26 ASIA PACIFIC: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2016 TO 2023 (USD MILLION)
FIGURE 27 REST OF THE WORLD: DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2016-2023 (USD MILLION)
FIGURE 28 REST OF THE WORLD: DATA CENTER CONSTRUCTION MARKET, BY DESIGN TYPE, 2016 TO 2023 (USD MILLION)
FIGURE 29 REST OF THE WORLD: DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE, 2016 TO 2023 (USD MILLION)
FIGURE 30 REST OF THE WORLD: DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2017 TO 2023 (USD MILLION)
FIGURE 31 COMPETITIVE BENCHMARKING

Global Data Center Equipment Market Research Report 2021-2025

In the context of China-US trade war and global economic volatility and uncertainty, it will have a big influence on this market. Data Center Equipment Report by Material, Application, and

USD 3200 View Report

Global Data Centre KVM Switches Market Research Report 2021-2025

In the context of China-US trade war and global economic volatility and uncertainty, it will have a big influence on this market. Data Centre KVM Switches Report by Material, Application,

USD 3200 View Report

Global Data Center Equipment Market Research Report 2021-2025

In the context of China-US trade war and global economic volatility and uncertainty, it will have a big influence on this market. Data Center Equipment Report by Material, Application, and

USD 3200 View Report

Global Data Centre KVM Switches Market Research Report 2021-2025

In the context of China-US trade war and global economic volatility and uncertainty, it will have a big influence on this market. Data Centre KVM Switches Report by Material, Application,

USD 3200 View Report

Fill The Form For Sample Request

Note : * Kindly provide us with your company id and get the sample reports at the earliest.

There is no Reviews available