Market Research Industry Reports

Road Infrastructure (Construction) in India: Market Analytics by Category & Cost Type to 2022

  • DESCRIPTION
  • TABLE OF CONTENTS
  • RELATED REPORTS
  • SAMPLE REQUEST
  • REVIEWS

Synopsis


Timetrics "Road Infrastructure (Construction) in India: Market Analytics by Category & Cost Type to 2022" contains historic and forecast market data for the road infrastructure category in India, it also provides detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services).

Summary


Road infrastructure includes, but is not limited to, highways, causeways, streets, parkways, pavements, underpasses, flyovers and overpasses, road bridges and road tunnels.

The Indian road infrastructure construction category continued to increase in the review period with a value of INRxxx.xx million (US$xxx.xx million) in 2017 and increased at a rate of x.xx% over 2016. The market recorded a CAGR of x.xx% from 2013 through 2017.

"Road Infrastructure (Construction) in India: Market Analytics by Category & Cost Type to 2022" provides a top-level overview and detailed insight into the operating environment of the road infrastructure market in India. It is an essential tool for companies active across the India construction value chain and for new players considering to enter the market.

Scope


A top level overview of the road infrastructure construction category in India.

Historic data provided from 2013 through 2017 and forecast from 2018 through 2022.

A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment & construction services) across the road infrastructure market.

Reasons To Buy


Provides a top level understanding of the Road Infrastructure construction in India.

Helps you understand the market performance by construction activity (new construction, repair and maintenance, refurbishment and demolition) and construction cost type (construction materials, construction equipment & construction services).

Allows you to plan future business decisions using the forecast figures given.

The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.


1 Introduction
1.1 What is this Report About?
1.2 Definitions
1.3 CAGR Definition and Calculation
2 Overall Road Infrastructure construction: Market Analysis
2.1 Overall Road Infrastructure construction Output Value, 2013 - 2017
2.2 Overall Road Infrastructure construction Output Value Forecast, 2018 - 2022
2.3 Overall Road Infrastructure construction Output, by Cost Type
2.3.1 Overall Road Infrastructure construction Output, by Cost Type, 2013 - 2017
2.3.2 Overall Road Infrastructure construction Output Forecast, by Cost Type, 2018 - 2022
3 Road Infrastructure construction Output: Analysis by Category
3.1 New Construction Output Value, 2013 - 2017
3.2 New Construction Output Value Forecast, 2018 - 2022
3.3 New Construction Output Value by Cost Type
3.3.1 New Construction Output, by Cost type, 2013 - 2017
3.3.2 New Construction Output Forecast, by Cost Type, 2018 - 2022
3.4 Repair & Maintenance Output Value, 2013 - 2017
3.5 Repair & Maintenance Output value Forecast, 2018 - 2022
3.6 Repair & Maintenance Output, by Cost Type
3.6.1 Repair & Maintenance Output, by Cost type, 2013 - 2017
3.6.2 Repair & Maintenance Output Forecast, by Cost Type, 2018 - 2022
3.7 Refurbishment Construction Output Value, 2013 - 2017
3.8 Refurbishment Construction Output Value Forecast, 2018 - 2022
3.9 Refurbishment Construction Output, by Cost Type
3.9.1 Refurbishment Construction Output, by Cost type, 2013 - 2017
3.9.2 Refurbishment Construction Output Forecast, by Cost type, 2018 - 2022
3.1 Demolition Construction Output Value, 2013 - 2017
3.11 Demolition Construction Output Value Forecast, 2018 - 2022
3.12 Demolition Construction Output, by Cost Type
3.12.1 Demolition Construction Output, by Cost type, 2013 - 2017
3.12.2 Demolition Construction Output Forecast, by Cost type, 2018 - 2022
4 Appendix
4.1 Summary Methodology
4.2 Exchange Rates
4.3 About Timetric
4.4 Timetrics Services
4.5 Disclaimer


List of Tables


Table 1: Timetric- Road Infrastructure construction Market Definitions
Table 2: Indian Overall Road Infrastructure construction Output Value (US$ Million), 2013 - 2017
Table 3: Indian Overall Road Infrastructure construction Output Value (INR Million), 2013 - 2017
Table 4: Indian Overall Road Infrastructure construction Output Value (US$ Million), 2018 - 2022
Table 5: Indian Overall Road Infrastructure construction Output Value (INR Million), 2018 - 2022
Table 6: Indian Overall Road Infrastructure construction Output, by Cost Type (US$ Million), 2013 - 2017
Table 7: Indian Overall Road Infrastructure construction Output, by Cost Type (INR Million), 2013 - 2017
Table 8: Indian Overall Road Infrastructure construction Output, by Cost Type (US$ Million), 2018 - 2022
Table 9: Indian Overall Road Infrastructure construction Output, by Cost Type (INR Million), 2018 - 2022
Table 10: Indian Road Infrastructure construction Output Value, New Construction (US$ Million), 2013 - 2017
Table 11: Indian Road Infrastructure construction Output Value, New Construction (INR Million), 2013 - 2017
Table 12: Indian Road Infrastructure construction Output Value, New Construction (US$ Million), 2018 - 2022
Table 13: Indian Road Infrastructure construction Output Value, New Construction (INR Million), 2018 - 2022
Table 14: Indian Road Infrastructure construction Output, New Construction by Cost Type (US$ Million), 2013 - 2017
Table 15: Indian Road Infrastructure construction Output, New Construction by Cost Type (INR Million), 2013 - 2017
Table 16: Indian Road Infrastructure construction Output, New Construction by Cost Type (US$ Million), 2018 - 2022
Table 17: Indian Road Infrastructure construction Output, New Construction by Cost Type (INR Million), 2018 - 2022
Table 18: Indian Road Infrastructure construction Output Value, Repair & Maintenance (US$ Million), 2013 - 2017
Table 19: Indian Road Infrastructure construction Output Value, Repair & Maintenance (INR Million), 2013 - 2017
Table 20: Indian Road Infrastructure construction Output Value, Repair & Maintenance (US$ Million), 2018 - 2022
Table 21: Indian Road Infrastructure construction Output Value, Repair & Maintenance (INR Million), 2018 - 2022
Table 22: Indian Road Infrastructure construction Output, Repair & Maintenance by Cost Type(US$ Million), 2013 - 2017
Table 23: Indian Road Infrastructure construction Output, Repair & Maintenance by Cost Type (INR Million), 2013 - 2017
Table 24: Indian Road Infrastructure construction Output, Repair & Maintenance by Cost Type (US$ Million), 2018 - 2022
Table 25: Indian Road Infrastructure construction Output, Repair & Maintenance by Cost Type (INR Million), 2018 - 2022
Table 26: Indian Road Infrastructure construction Output Value, Refurbishment (US$ Million), 2013 - 2017
Table 27: Indian Road Infrastructure construction Output Value, Refurbishment (INR Million), 2013 - 2017
Table 28: Indian Road Infrastructure construction Output Value, Refurbishment (US$ Million), 2018 - 2022
Table 29: Indian Road Infrastructure construction Output Value, Refurbishment (INR Million), 2018 - 2022
Table 30: Indian Road Infrastructure construction Output, Refurbishment by Cost Type (US$ Million), 2013 - 2017
Table 31: Indian Road Infrastructure construction Output, Refurbishment by Cost Type (INR Million), 2013 - 2017
Table 32: Indian Road Infrastructure construction Output, Refurbishment by Cost Type (US$ Million), 2018 - 2022
Table 33: Indian Road Infrastructure construction Output, Refurbishment by Cost Type (INR Million), 2018 - 2022
Table 34: Indian Road Infrastructure construction Output Value, Demolition (US$ Million), 2013 - 2017
Table 35: Indian Road Infrastructure construction Output Value, Demolition (INR Million), 2013 - 2017
Table 36: Indian Road Infrastructure construction Output Value, Demolition (US$ Million), 2018 - 2022
Table 37: Indian Road Infrastructure construction Output Value, Demolition (INR Million), 2018 - 2022
Table 38: Indian Road Infrastructure construction Output, Demolition by Cost Type (US$ Million), 2013 - 2017
Table 39: Indian Road Infrastructure construction Output, Demolition by Cost Type (INR Million), 2013 - 2017
Table 40: Indian Road Infrastructure construction Output, Demolition by Cost Type (US$ Million), 2018 - 2022
Table 41: Indian Road Infrastructure construction Output, Demolition by Cost Type (INR Million), 2018 - 2022
Table 42: Exchange Rate (Annual Average), 2013 2017
Table 43: Exchange Rate (Annual Average), 2018 2022 Forecast


List of Figures


Figure 1: Indian Overall Road Infrastructure construction Output Value (INR Million), 2013 - 2017
Figure 2: Indian Overall Road Infrastructure construction Output Value (INR Million), 2018 - 2022
Figure 3: Indian Overall Road Infrastructure construction Output, by Cost Type (INR Million), 2013 - 2017
Figure 4: Indian Overall Road Infrastructure construction Output, by Cost Type (INR Million), 2018 - 2022
Figure 5: Indian Road Infrastructure construction Output Value, New Construction (INR Million), 2013 - 2017
Figure 6: Indian Road Infrastructure construction Output Value, New Construction (INR Million), 2018 - 2022
Figure 7: Indian Road Infrastructure construction Output, New Construction by Cost Type (INR Million), 2013 - 2017
Figure 8: Indian Road Infrastructure construction Output, New Construction by Cost Type (INR Million), 2018 - 2022
Figure 9: Indian Road Infrastructure construction Output Value, Repair & Maintenance (INR Million), 2013 - 2017
Figure 10: Indian Road Infrastructure construction Output Value, Repair & Maintenance (INR Million), 2018 - 2022
Figure 11: Indian Road Infrastructure construction Output, Repair & Maintenance by Cost Type (INR Million), 2013 - 2017
Figure 12: Indian Road Infrastructure construction Output, Repair & Maintenance by Cost Type (INR Million), 2018 - 2022
Figure 13: Indian Road Infrastructure construction Output Value, Refurbishment (INR Million), 2013 - 2017
Figure 14: Indian Road Infrastructure construction Output Value, Refurbishment (INR Million), 2018 - 2022
Figure 15: Indian Road Infrastructure construction Output, Refurbishment by Cost Type (INR Million), 2013 - 2017
Figure 16: Indian Road Infrastructure construction Output, Refurbishment by Cost Type (INR Million), 2018 - 2022
Figure 17: Indian Road Infrastructure construction Output Value, Demolition (INR Million), 2013 - 2017
Figure 18: Indian Road Infrastructure construction Output Value, Demolition (INR Million), 2018 - 2022
Figure 19: Indian Road Infrastructure construction Output, Demolition by Cost Type (INR Million), 2013 - 2017
Figure 20: Indian Road Infrastructure construction Output, Demolition by Cost Type (INR Million), 2018 - 2022

USD 1960View Report

Sinclair Broadcast Group, Inc. - Mergers and Acquisitions (M&A), Partnerships and Alliances and Investment Report

Sinclair Broadcast Group, Inc. - Mergers & Acquisitions (M&A), Partnerships & Alliances and Investment ReportMarketlines Sinclair Broadcast Group, Inc. Mergers & Acquisitions (M&A), Partnerships & Alliances and Investments report includes

USD 350View Report

Sewage Infrastructure (Construction) in Argentina: Market Analytics by Category & Cost Type to 2022

SynopsisTimetrics Sewage Infrastructure (Construction) in Argentina: Market Analytics by Category & Cost Type to 2022 contains historic and forecast market data for the sewage infrastructure category in Argentina, it also

USD 500View Report

Water Infrastructure (Construction) in Argentina: Market Analytics by Category & Cost Type to 2022

A top level overview of the water infrastructure construction category in Argentina.

USD 500View Report

Your are not allow to send sample request
Fill The Form For Sample Request
Full Name :*
Bussiness Email: *
Email: *
Country :*
Contact No.*
Alternate No.
Note.:*Kindly provide us with your company id and get the sample reports at the earliest.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 500
  • Site Licence    USD 1000
  • Enterprise Wide Licence    USD 1500
$ 500

Reports Details

Published Date : Apr 2018
No. of Pages :40
Country :South America
Category :Construction
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube