"MOEM Pak Lay Hydroelectric Power Plant 1320 MW Xayaburi Province - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MOEM Pak Lay Hydroelectric Power Plant 1320 MW Xayaburi Province - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


Ministry of Energy and Mines, Laos (MOEM) is planning to construct a hydroelectric power plant in Xayaburi Province, Laos.

The project involves the construction of a 1,320MW hydroelectric power plant with the dam designed to be at 630m long, 35m tall, with a 108km2 reservoir area.

It will include the construction of a dam, a powerhouse, a substation, spillway, a penstock, a control room, a head race tunnel and related infrastructure, the installation of turbines, generators, transformers, a switchboard, safety and security systems, and the laying of transmission lines.

The project is planned to be implemented on through public-private-partnership (PPP) mode on buildoperatetransfer (BOT) basis.

In 2007, MOEM signed a Memorandum of Understanding (MOU) with Sinohydro Corporation Co Ltd and China National Electronics Import & Export Corporation to develop the project on a Build Operate Transfer (BOT) basis.

In June 2007, Lao government approved a plan by CEIEC and Sinohydro to spend 30 months preparing a survey, which includes technical, economic, social, and environmental considerations.

In 2009, IEE environmental study undertaken by Norconsult was submitted to Mekong River Commission, which was later approved.

The project will be funded by Chinas Export-Import Bank, through a US$1.7 billion loan.

In December 2014, the project was placed on hold, due to undisclosed reasons. However, later it has been revived.

Environmental Impact Assessment (EIA) of the project has been approved.

Ch karnchang Plc. has been appointed as study consultant for the project.

Planning activities are underway.

Scope


The project involves the construction of a 1,320MW hydroelectric power plant on Mekong River in Xayaburi Province in Laos.

The US$2,400 million project includes the following:

1. Construction of a dam

2. Construction of a powerhouse

3. Construction of a substation

4. Construction of spillway

5. Construction of a penstock

6. Construction of a control room

7. Construction of a head race tunnel

8. Installation of turbines

9. Installation of generators

10. Installation of transformers

11. Installation of switch board

12. Installation of safety and security system

13. Laying of transmission lines

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.

Table of Contents


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix


MoEM – Ruhudji Hydroelectric Power Plant 358 MW – Tanzania - Project Profile

Synopsis MoEM Ruhudji Hydroelectric Power Plant 358 MW Tanzania - Project Profile contains information on the scope of the project including project overview and location. The profile also details

USD 75View Report

MoEM – Nam Bi Cascade Hydroelectric Power Plant 130 MW – Sekong Province - Project Profile

Synopsis MoEM Nam Bi Cascade Hydroelectric Power Plant 130 MW Sekong Province - Project Profile contains information on the scope of the project including project overview and location. The

USD 75View Report

CPIC – Wind Farm 1000 MW – Pakistan - Project Profile

Synopsis CPIC Wind Farm 1000 MW Pakistan - Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership

USD 75View Report

ZSPL – Bahawalpur Solar Power Plant 100 MW – Pakistan - Project Profile

Synopsis ZSPL Bahawalpur Solar Power Plant 100 MW Pakistan - Project Profile contains information on the scope of the project including project overview and location. The profile also details

USD 75View Report

Your are not allow to send sample request
Fill The Form For Sample Request
Full Name :*
Bussiness Email: *
Email: *
Country :*
Contact No.*
Alternate No.
Note.:*Kindly provide us with your company id and get the sample reports at the earliest.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 75
  • Site Licence    USD 150
  • Enterprise Wide Licence    USD 225
$ 75

Reports Details

Published Date : Mar 2018
No. of Pages :7
Country :Laos
Category :Construction
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube