Market Research Industry Reports

SFPUC Calaveras Dam Replacement California - Project Profile

  • DESCRIPTION
  • TABLE OF CONTENTS
  • RELATED REPORTS
  • SAMPLE REQUEST
  • REVIEWS

Synopsis


"SFPUC Calaveras Dam Replacement California - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "SFPUC Calaveras Dam Replacement California - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


The San Francisco Public Utilities Commission (SFPUC) is undertaking the construction of Calaveras Dam Replacement project at Calaveras Creek in the Diablo Mountain Range in Alameda County, California, the US.

The project involves the construction of a new 67m high earth and rockfill dam immediately downstream of the existing dam. The dam will have a crest length of 369m, a width of 24.3m at the crest and 359m at the base.

The project involves removal of existing spillway and the construction of an ungated spillway with a concrete-lined channel and a new stilling basin, removal of existing intake tower, plug the shaft, and construction of a new intake tower and shaft connecting to an existing drain and three water inlet adits.

The project includes the construction of a bypass tunnel through the Alameda Creek Diversion Dam to improve habitat conditions in Alameda Creek downstream of the diversion, implementation of flow releases to support native fishes in Calaveras and Alameda Creeks downstream of Calaveras Dam and the Alameda Creek Diversion Dam.

The estimated 2,293,664m3 of materials used to construct the new dam will be excavated from SFPUC property near the dam, a small portion of the construction materials will also be imported from offsite.

San Francisco Planning Department and the San Francisco Public Utilities Commission each unanimously approved the project in January 2011.

Parsons Corporation has been appointed to review the technical design and construct-ability as well as value engineering studies.

In July 2011, A joint-venture (JV) of Dragados USA, Sukut Construction, Inc. and Flatiron Construction has been appointed as the construction contractor for the project.

Black & Veatch Corporation and Kleinfelder were appointed as project managers and URS Corporation as designer for the project.

In July 2012, the project has moved 1 million cubic yards of existing earthen materials excavated from the dam foundation.

The project team excavated approximately 20,000 cubic yards per day of materials which were then moved to disposal areas within the project site.

Construction works on the project commenced in August 2011.

Construction works of the new spillway were completed on April 18, 2016.

Dam embankment work is scheduled to begin in the fourth quarter of 2016.

In March 2016, 77% of the construction works were completed.

In May 2017, 80% of the construction works were completed.

Construction works are underway and are expected to be completed by the third quarter of 2019.

Scope


The project involves the construction of a new 67m high earth and rockfill dam to replace the existing Calaveras Dam at Calaveras Creek in the Diablo Mountain Range in Alameda County, California, the US.

The US$810 million project includes the following:

1. Construction of a 67m high, 369m long, and 24.3m wide dam

2. Construction of a 472.4m long spillway

3. Construction of a new intake and outlet shaft tower

4. Construction of a 1.8m diameter steel lined tunnel

5. Construction of a 78inch diameter downstream pipeline

6. Construction of three adit tunnels

7. Construction of a bypass tunnel through the Alameda Creek Diversion Dam

8. Construction of other related facilities

9. Removal of existing spillway

10. Removal of existing intake tower

11. Excavation work of nearly 5,351,884m3

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix


SFPUC – Calaveras Dam Replacement – California - Project Profile

Synopsis SFPUC Calaveras Dam Replacement California - Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership and

USD 75View Report

SFPUC – Westside Recycled Water Treatment Plant – California - Project Profile

Synopsis SFPUC Westside Recycled Water Treatment Plant California- Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership

USD 75View Report

SFPUC – Westside Recycled Water Treatment Plant – California - Project Profile

Synopsis SFPUC Westside Recycled Water Treatment Plant California- Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership

USD 75View Report

Your are not allow to send sample request
Fill The Form For Sample Request
Full Name :*
Bussiness Email: *
Email: *
Country :*
Contact No.*
Alternate No.
Note.:*Kindly provide us with your company id and get the sample reports at the earliest.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 75
  • Site Licence    USD 150
  • Enterprise Wide Licence    USD 225
$ 75

Reports Details

Published Date : May 2018
No. of Pages :9
Country :United States of America
Category :Company Profiles
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube