"Hidropaute Cardenillo Hydro Power Plant 595 MW Azuay - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "Hidropaute Cardenillo Hydro Power Plant 595 MW Azuay - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


Hidropaute S/A, a state-owned company controlled by the Corporacin Elctrica del Ecuador (Celec), announced plans to construct the Cardenillo Hydro Power Plant project on the Paute river in Ecuador.

The project involves the construction of a hydroelectric power plant of 595MW on Paute river at Santiago basin, Ecuador. It includes the construction of the pressure conduction tunnel from the right bank, surge shaft, underground pressure pipe, a powerhouse in the cavern and restitution tunnel of 2,015m long and 7,14m in diameter. The detour for the construction of the diversion dam will be made through a tunnel in the left bank of 300m in length.

The project also includes the construction of an underground powerhouse, a switchyard, a substation and related infrastructure, and the installation of Pelton-type turbines, generators, and other equipment.

This project is the part of Complejo Hidroelctrico Paute or Paute Hydroelectric Complex project. The Paute Sopladora Project is located downstream the Molino Central and will collect the turbine water flows of up to 150m/s, directly from the two discharge tunnels of the Central Paute-Molino, and will drive to the underground powerhouse through a system of a tunnel of a pressure of 5.5km of length and pressure pipeline.

The project was announced by 2008, but due to environmental and financial reasons, the project has put on hold.

Celec signed a contract with a Consortium Poyry Caminosca Asociados to carry out studies for the project in December 2010. Celec unit Hidropaute had awarded twenty-two-month pre-feasibility studies and definitive design contract.

Consorcio China Gezhouba Group Company FOPECA S.A (CGGC Fopeca S.A.) was appointed as the development contractor for this project.

CCH (Consorcio Consultor Hidroaustral) formed by Caminosca S.A. (Ecuador) and Leme Engenharia Ltda. (Brazil) was appointed as the EPCIM contractor for this project.

In June 2017, feasibility studies were completed and the project is waiting for approvals.

Scope


Cardenillo Hydro Power Plant project involves the construction of a dam, tunnel and hydro electric power plant on the Paute river at Santiago basin in Azuay province, Ecuador.

The US$1,000 million project includes the following:

1. Construction of a conduction tunnel of 800m long with 630m diameter

2. Construction of a restitution tunnel of 4,413m long with 7.14m diameter

3. Construction of a diversion dam with 15m height

4. Construction of surge shafts

5. Installation of underground pressure pipes of 400m with 5.4m diameter

6. Construction of an underground powerhouse

7. Construction of a substation

8. Installation of turbines

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix


Hidropaute – Cardenillo Hydro Power Plant 595 MW – Azuay - Project Profile

Synopsis Hidropaute Cardenillo Hydro Power Plant 595 MW Azuay - Project Profile contains information on the scope of the project including project overview and location. The profile also details

USD 75 View Report

Hidropaute – Cardenillo Hydro Power Plant 595 MW – Azuay - Construction Project Profile

Synopsis Hidropaute Cardenillo Hydro Power Plant 595 MW Azuay contains information on the scope of the project including project overview and location. The profile also details project ownership and

USD 75 View Report

Hidropaute – Cardenillo Hydro Power Plant 595 MW – Azuay - Construction Project Profile

Synopsis Hidropaute Cardenillo Hydro Power Plant 595 MW Azuay contains information on the scope of the project including project overview and location. The profile also details project ownership and

USD 75 View Report

Your are not allow to send sample request

Fill The Form For Sample Request

Note : * Kindly provide us with your company id and get the sample reports at the earliest.

There is no Reviews available