MHPA – Mangdechhu Hydroelectric Power Plant 720 MW – Bhutan - Project Profile

Synopsis


"MHPA Mangdechhu Hydroelectric Power Plant 720 MW Bhutan - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MHPA Mangdechhu Hydroelectric Power Plant 720 MW Bhutan - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


Mangdechhu Hydroelectric Project Authority (MHPA) through a partnership with National Hydroelectric Power Corporation Ltd (NHPC), NTPC Ltd, Tehri Hydro Development Corporation Ltd (THDC), and Satluj Jal Vidyut Nigam Ltd (SJVNL), is undertaking the construction of a Hydroelectric Power Plant project in Trongsa district, Bhutan.

The project involves the construction of a 720MW (4X180MW) hydroelectric power plant. It will include the construction of a dam, head race tunnel, tail race tunnel.

It will also include the construction of powerhouse and substation, the installation of turbines and generators, and the laying of transmission lines.

The project is being funded by the Government of India (GOI) through 30% grant and 70% loan.

National Hydro Power Corporation (NHPC) has been appointed to prepare detailed project report (DPR) for the project.

In March 2010, NHPC submitted DPR of the project to Bhutan Electricity Authority.

The project is being developed under packages namely Package C1, Package C2, Package C3, Package C4, Electro Mechanical Package and Infrastructure Works Package.

The Package C1 was awarded to Jaiprakash Associates Ltd. The scope of contract involves the construction of dam and associated works. It includes the construction of 670m diversion tunnel, Adit to GOC of SFT (242.48m) and de-silting Chamber of 212.5m.

The Package C2 was awarded to Gammon India Ltd and Marti India Ltd. The scope of contract involves the construction of head race tunnel (HRT) works which comprises of 358.7m Adit I, 657.57m Adit II, 354.25m Adit III, 415.01m Adit IV and 577.37m Adit V.

The Package C3 was awarded to Jal Power Corporation Ltd. The scope of work involves the construction of underground power house and associated works including excavation of surge shaft, intermediate Adits to IPS I and IPS II, 680m main access tunnel, ventilation tunnel and tail race tunnel.

The Package C4 was awarded to PES Engineering Ltd. The scope of work involves the construction of hydro-mechanical works.

Electro Mechanical Package was awarded to Bharat Heavy Electricals Ltd (BHEL) whose scope of contract involves supplying of main equipment along with accessories including mandatory spares, tool & plants for the project.

The other package includes the construction of 400KV Single Circuit on Double Circuit twin moose tower to Jigmeling via Goling.

The Transmission Line Package was awarded to Kalptaru Power Transmission Line ltd (KPTL) to construct the 400KV double corridor transmission lines between Mangdechuu port head yard and Jigmeling in Gelephu, which is about 85km.

BHEL was awarded with BTG contract for the project and infrastructure package was awarded to local companies.

On January 24, 2013, MHPA invited tenders for the construction of crate walls over portal P2 of the Head Race Tunnel and Site Office for the project with February 9, 2013, as the last date to submit the bids.

In December 2013, MHPA invited tender for the Electro-Mechanical Works: Package EM-3 (400kV Gas Insulated Switchgear) and EM-4 (400kV Cross Link Polyethylene (XLPE) cables.

Construction works are underway.

Scope


The project involves the construction of a hydroelectric power plant with 720MW capacity in Mangdechhu, Trongsa district, Bhutan.

The US$554 million project includes the following:

1. Construction of a dam

2. Construction of a powerhouse

3. Construction of a 13.5km head race tunnel

4. Construction of a tail race tunnel

5. Construction of a substation

6. Installation of turbines

7. Installation of generator

8. Laying of transmission lines

9. Construction of other related facilities

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix


MHPA – Mangdechhu Hydroelectric Power Plant 720 MW – Bhutan - Project Profile

Synopsis MHPA Mangdechhu Hydroelectric Power Plant 720 MW Bhutan - Project Profile contains information on the scope of the project including project overview and location. The profile also details

USD 75 View Report

MHPA – Mangdechhu Hydroelectric Power Plant 720 MW – Bhutan Project Profile

Synopsis MHPA Mangdechhu Hydroelectric Power Plant 720 MW Bhutan Project Profile contains information on the scope of the project including project overview and location. The profile also details project

USD 75 View Report

MHPA – Mangdechhu Hydroelectric Power Plant 720 MW – Bhutan Project Profile

Synopsis MHPA Mangdechhu Hydroelectric Power Plant 720 MW Bhutan Project Profile contains information on the scope of the project including project overview and location. The profile also details project

USD 75 View Report

Your are not allow to send sample request

Fill The Form For Sample Request

Note : * Kindly provide us with your company id and get the sample reports at the earliest.

There is no Reviews available