"MOTC Sharq Crossing Qatar - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MOTC Sharq Crossing Qatar - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


The Ministry of Transport and Communications, Qatar (MOTC) plans to undertake the construction of the Sharq Crossing project in Qatar.

The project involves the construction of a 12km long crossing. It will include the construction of three bridges, two immersed tube tunnels and three cut-and-cover tunnels, small pedestrian bridge, supporting walls and related facilities.

The three bridges are named as West Bay Bridge, Cultural Village Bridge, and Sharq Bridge of different length ranging between 600m and 1,310m and will connect to 8km of subsea tunnels.

West Bay Bridge will be a two-deck tied arched structure incorporating a longitudinal park and cable car system, extending to an island of terraced levels providing recreational facilities and a marina.

Cultural Village Bridge will comprise a series of cable-stayed structures that skim across the bay in a pattern of descending scales creating a long bridge.

Sharq Bridge will be a tubular structure that spans the inlet adjacent to the Hamad International Airport (HIA).

The immersed tunnel link between Sharq Bridge and West Bay Bridge will consist of three lanes each way and two lanes in each direction between West Bay Bridge and Cultural Village Bridge.

COWI has been appointed as the study consultant and Santiago Calatrava, LLP as the design consultant for the project. Some of the other firms which had submitted their designs were Grimshaw, Arup, Atkins, Halcrow, and Forster+Partners.

In April 2013, US-based Fluor and KEO International Consultants were appointed to manage the project.

Tunnel Engineering Consultants (TEC) has been appointed as the engineering consultant. TEC scope of work includes the validated concept design of the two immersed tunnels of 3.1km and 2.8km, the three cut-and-cover tunnels with a length of 950m -1250m each connecting the bridges to the mainland and the Marine Interchange of approx. 600 m, connecting the two immersed tunnels and one of the bridges.

The scope of work also included the design of bridge foundations, roads, utilities, mechanical, electrical and plumbing (MEP) systems, the integral safety concept including ventilation and construction schedule.

TEC worked together with HBI Haerter Ltd. (HBI) for safety and tunnel ventilation and Geotechnical Consulting Group (GCG) for geotechnical expertise.

In September 2013, TEC commenced the work and was completed by January 2014.

In the second quarter of 2014, Ashghal invited pre-qualification bids and expression of interest for the construction work.

The work was split into eight packages; land-based enabling works, marine-based enabling works, west Bay approach and bridge, cultural city approach and bridge, Sharq approach and bridge, immersed tunnel and marine interchange, surface street modifications, Systems integration contract, operations and maintenance (O&M) contract. The main package is design-and-build contracts, which covers West Bay approach and bridge, cultural city approach and bridge, Sharq approach and bridge, and the immersed tunnel and marine interchange contract.

On October 18, 2014, 13-14 groups submitted pre-qualification documents for the contract of tunnels and 19-21 groups have submitted for the contract of bridges.

In January 2015, the project was placed on hold due to varied reasons, one of which is financial issues.

In November 2017, the Ministry of Transport and Communications, Qatar (MOTC) invited pre-qualification bids for the PreConcept design consultancy services with a submission deadline on December 24, 2017.

Gruppo migliaccio has been appointed as supply contractor.

MOTC is in the process of appointing design consultant.

Scope


The project involves the construction of a 12km long crossing at the Doha Bay in Doha, Qatar.

The US$5,000 million project includes the following:

1. Construction of three bridges

2. Construction of two immersed tube tunnel

3. Construction of small pedestrian bridge

4. Construction of supporting walls

5. Construction of related facilities

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix


MOTC – Bishkek-Osh Alternative Road – Kyrgyzstan - Project Profile

Synopsis MOTC Bishkek-Osh Alternative Road Kyrgyzstan - Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership and

USD 75View Report

MOTC – Sharq Crossing – Qatar - Project Profile

Synopsis MOTC Sharq Crossing Qatar - Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership and funding,

USD 75View Report

MOTC – Bishkek-Osh Alternative Road – Kyrgyzstan - Project Profile

Synopsis MOTC Bishkek-Osh Alternative Road Kyrgyzstan - Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership and

USD 75View Report

MoTC – Nizwa to Thumrait Road Dualization – Oman - Project Profile

Synopsis MoTC Nizwa to Thumrait Road Dualization Oman - Project Profile contains information on the scope of the project including project overview and location. The profile also details project

USD 75View Report

Your are not allow to send sample request
Fill The Form For Sample Request
Full Name :*
Bussiness Email: *
Email: *
Country :*
Contact No.*
Alternate No.
Note.:*Kindly provide us with your company id and get the sample reports at the earliest.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 75
  • Site Licence    USD 150
  • Enterprise Wide Licence    USD 225
$ 75

Reports Details

Published Date : May 2018
No. of Pages :9
Country :Qatar
Category :Company Profiles
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube