1.1 List of Tables 4
1.2 List of Figures 4
2 Introduction 5
2.1 Company Report Guidance 5
3 Business Propensity Indicator Methodology 6
3.1 Methodology Adopted For Evaluating the Business Propensity Indicator for
Europe 6
3.1.1 Capacity and Reserve Potential 6
3.1.2 Regulatory Scenario 7
3.1.3 Investment Scenario 7
3.1.4 Transmission and Distribution (T&D) Infrastructure 9
3.1.5 Macro Economic Scenario 9
3.1.6 Competitive Scenario 10
3.2 Methodology Adopted to Arrive at a Final Rank 12
4 Power Market, Belgium, Business Propensity Indicator 15
4.1 Capacity and Reserve Potential 15
4.2 Regulatory Scenario 16
4.3 Investment Scenario 16
4.4 Transmission and Distribution Infrastructure 16
4.5 Macroeconomic Factors 17
4.6 Competitive Scenario 17
4.7 Conclusion 17
4.8 Business Propensity Indicator Ranking 18
4.8.1 Present Ranking 18
4.8.2 Future Ranking 19
5 Belgium Power Market Analysis, 2000-2030 20
5.1 Demand and Consumption Scenario 20
5.2 Power Market, Belgium, Import and Export Scenario, 2000 – 2010 21
5.3 Power Market, Belgium, Annual Power Consumption, 2000-2030 22
5.4 Power Market, Belgium, Cumulative Installed Capacity, 2000-2030 24
5.4.1 Cumulative Installed Capacity by Type of Power Plant: Percentage 24
5.4.2 Cumulative Installed Capacity: Total Value 25
5.4.3 Cumulative Thermal Installed Capacity, 2000-2030 28
5.4.4 Cumulative Hydro Installed Capacity, 2000-2030 30
5.4.5 Cumulative Nuclear Installed Capacity, 2000-2030 32
5.4.6 Cumulative Renewable Installed Capacity, 2000-2030 34
5.5 Power Market, Belgium, Annual Power Generation, 2000-2030 36
5.5.1 Annual Thermal Power Generation, 2000-2030 39
5.5.2 Annual Hydro Power Generation, 2000-2030 41
5.5.3 Annual Nuclear Power Generation, 2000-2030 43
5.5.4 Annual Renewable Power Generation, 2000-2030 45
6 Power Market, Belgium, Leading Active and Upcoming Projects 47
6.1 Active Power Projects 47
6.1.1 Leading Thermal Power Projects 47
6.1.2 Leading Hydro Power Projects 48
6.1.3 Leading Nuclear Commercial Reactors 48
6.1.4 Leading Renewable Power Projects 49
6.2 Upcoming Power Projects 50
6.2.1 Leading Thermal Power Projects 50
6.2.2 Leading Renewable Power Projects 51
7 Power Market, Belgium, Regulatory Structure 52
7.1 Regulatory Structure Overview 52
7.1.1 Electricity Laws 52
7.1.2 Nuclear Policy 53
7.1.3 Green Certificates 53
8 Power Market, Belgium, Infrastructure 54
8.1 Transmission Network 54
8.1.1 Grid Interconnections 55
8.1.2 Future Development Plans 55
8.1.3 Distribution Overview 55
9 Power Market, Belgium, Competitive Landscape: Snapshot of the Top Power
Companies 57
9.1 Power Market, Belgium, Market Share of the Major Power Companies 57
9.2 Key Company in the Belgium Power Market, Electrabel 58
9.2.1 Electrabel, Company Overview 58
9.2.2 Electrabel, Business Description 58
9.2.3 Electrabel, SWOT Analysis 59
9.3 Key Company in the Belgium Power Market, SPE-Luminus 62
9.3.1 SPE-Luminus, Company Overview 62
9.3.2 SPE-Luminus, Business Description 62
9.3.3 SPE-Luminus, SWOT Analysis 63
10 Appendix 66
10.1 Market Definitions 66
10.1.1 Power 66
10.1.2 Installed Capacity 66
10.1.3 Active Installed Capacity 66
10.1.4 Electricity Generation 66
10.1.5 Thermal Power 66
10.1.6 Hydro Power 66
10.1.7 Nuclear Power 66
10.1.8 Renewable Energy Resources 66
10.1.9 Generation Company 66
10.1.10 Electricity Consumption 66
10.1.11 Transmission Network 66
10.1.12 Interconnector 66
10.1.13 Transmission and Distribution Loss 66
10.2 Abbreviations 67
10.3 Company ’s Methodology 67
10.3.1 Coverage 67
10.3.2 Secondary Research 68
10.3.3 Primary Research 68
10.3.4 Modeling and Forecasting 68
10.4 Contact Us 68
10.5 Disclaimer 69
1.1 List of Tables
Table 1: Ease of Doing Business-Categories and Subcategories 8
Table 2: Scoring Methodology for the Parameters 13
Table 3: Best Score for Present and Future Scenario 14
Table 4: Power Market, Belgium, Breakdown of Electricity Consumption, by Sector
(%), 2010 (Estimated) 20
Table 5: Power Market, Belgium, Total Annual Imports and Exports (GWh),
2000-2010 21
Table 6: Power Market, Belgium, Annual Power Consumption (GWh), 2000-2030 23
Table 7: Power Market, Belgium, Cumulative Installed Capacity (MW), 2000-2030 26
Table 8: Power Market, Belgium, Cumulative Thermal Installed Capacity (MW),
2000-2030 29
Table 9: Power Market, Belgium, Cumulative Hydro Installed Capacity (MW),
2000-2030 31
Table 10: Power Market, Belgium, Cumulative Nuclear Installed Capacity (MW),
2000-2030 33
Table 11: Power Market, Belgium, Cumulative Renewable Installed Capacity (MW),
2000-2030 35
Table 12: Power Market, Belgium, Annual Power Generation (GWh), 2000-2030 37
Table 13: Power Market, Belgium, Annual Thermal Power Generation (GWh),
2000-2030 40
Table 14: Power Market, Belgium, Annual Hydro Power Generation (GWh), 2000-2030
42
Table 15: Power Market, Belgium, Annual Nuclear Power Generation (GWh),
2000-2030 44
Table 16: Power Market, Belgium, Annual Renewable Power Generation (GWh),
2000-2030 46
Table 17: Power Market, Belgium, Leading Active Thermal Power Projects (MW),
2010 47
Table 18: Power Market, Belgium, Leading Active Hydro Power Projects (MW), 2010
48
Table 19: Power Market, Belgium, Leading Active Nuclear Commercial Reactors
(MW), 2010 48
Table 20: Power Market, Belgium, Leading Active Renewable Power Projects (MW),
2010 49
Table 21: Power Market, Belgium, Leading Upcoming Thermal Power Projects (MW),
2010 50
Table 22: Power Market, Belgium, Leading Upcoming Renewable Power Projects (MW),
2010 51
Table 23: Power Market, Belgium, Length of Transmission Network by Voltage (Ckm),
2000-2020 54
Table 24: Power Market, Belgium, Length of Distribution Network by Voltage (Ckm),
2000-2020 56
Table 25: Power Market, Belgium, Installed Capacity Share of Major Power
Companies (%), 2010 57
Table 26: Electrabel S.A., SWOT Analysis 59
Table 27: SPE-Luminus, SWOT Analysis 63
Table 28: Abbreviations 67
1.2 List of Figures
Figure 1: Power Market, Belgium, Business Propensity Indicator 15
Figure 2: Power Market, Belgium, Business Propensity Indicator Ranking 18
Figure 3: Power Market, Belgium, Breakdown of Electricity Consumption, by Sector
(%), 2010 (Estimated) 20
Figure 4: Power Market, Belgium, Total Annual Imports and Exports (GWh),
2000-2010 21
Figure 5: Power Market, Belgium, Annual Power Consumption (GWh), 2000-2030 22
Figure 6: Power Market, Belgium, Cumulative Installed Capacity by Type of Power
Plant (%), 2010 24
Figure 7: Power Market, Belgium, Cumulative Installed Capacity (MW), 2000-2030
25
Figure 8: Power Market, Belgium, Installed Capacity Comparison of 10 Western
Europe Countries(MW), 2010-2020 27
Figure 9: Power Market, Belgium, Cumulative Thermal Installed Capacity (MW),
2000-2030 28
Figure 10: Power Market, Belgium, Cumulative Hydro Installed Capacity (MW),
2000-2030 30
Figure 11: Power Market, Belgium, Cumulative Nuclear Installed Capacity (MW),
2000-2030 32
Figure 12: Power Market, Belgium, Cumulative Renewable Installed Capacity (MW),
2000-2030 34
Figure 13: Power Market, Belgium, Annual Power Generation (GWh), 2000-2030 36
Figure 14: Power Market, Belgium, Annual Generation Comparison of 10 Western
Europe Countries (GWh), 2010-2020 38
Figure 15: Power Market, Belgium, Annual Thermal Power Generation (GWh),
2000-2030 39
Figure 16: Power Market, Belgium, Annual Hydro Power Generation (GWh), 2000-2030
41
Figure 17: Power Market, Belgium, Annual Nuclear Power Generation (GWh),
2000-2030 43
Figure 18: Power Market, Belgium, Annual Renewable Power Generation (GWh),
2000-2030 45
Figure 19: Power Market, Belgium, Installed Capacity Share of Major Power
Companies (%), 2010 57
Companies Mentioned :
Electrabel
SPE-Luminus
|