Market Research Reports and Industry Reports

Trinidad and Tobago Trintes Project Panorama - Oil and Gas Upstream Analysis Report

  • DESCRIPTION
  • TABLE OF
    CONTENTS
  • RELATED
    REPORTS
  • SAMPLE REQUEST
  • PURCHASE BY
    SECTION
Trinidad and Tobago Trintes Project Panorama - Oil and Gas Upstream Analysis Report

Summary

Trinidad and Tobago Trintes Project Panorama, GlobalDatas latest release, presents a comprehensive overview of the asset. This upstream report includes detailed qualitative and quantitative information on the asset, provides a full economic assessment and reflects several parameters including (but not limited to) geological profile, asset development and specific challenges. Based on this analysis, future outlook for the asset is presented with possible trends and related scenarios identifying upside/downside potential.

Scope

- Overview of the asset based on an analysis of the economic indicators
- Key financial indicators including Net Present Value and Internal Rate of Return
- Review of factors affecting the economic outcome of the field including development overview, geology, challenges, reserves and production with qualitative perspective on of the overall assets life with GlobalDatas analysis on the assets future outlook
- Detailed production profile for the asset, giving annual output rates for each commodity produced
- Cash flow statements from our economic analysis of the asset including capital expenditures, operating expenditures and tax liability
- Individual valuations for equity holders
- Sensitivity analysis for asset value considering a range of factors

Reasons to buy

- Understand the economic and non-economic factors that affect production of an asset
- Benefit from an asset valuation derived from detailed research and modeling by our analysts
- Basic view of various scenarios and its effect on the asset for risk or strategy planning
- Utilize the quantitative and qualitative evaluation to ascertain trends within the region to inform decision making
- Identify economic trends of an asset to determine investment requirements

1
2
2
2 Project Panorama 3
3 Project Update 4
4 Outlook 5
5 Asset Summary 6
6 Development Overview 11
7 Geology 14
8 Challenges 15
9 Reserves and Production 16
10 Economic Analysis 18
11 Appendix 21
11.1 Contact Us 21
11.2 Disclaimer 21

List Of Tables


Table 1: Project Details 3
Table 2: Participation Overview 6
Table 3: Key Valuation Metrics 6
Table 4: Asset Valuation Metrics 8
Table 5: Cash Flow Summary 9
Table 6: Fiscal Take Summary 9
Table 7: Production Summary 17
Table 8: Production Data 17
Table 9: Project Cash Flow 20

List Of Figures


Figure 1: Annual Cash Flow 7
Figure 2: Full Cycle Expenditure And Revenue Split 7
Figure 3: Remaining Expenditure And Revenue Split 8
Figure 4: NPV Sensitivity 9
Figure 5: Percentage NPV Difference 10
Figure 6: Production 16

The Future of Trinidad Automobile Markets to 2023- Trends, Drivers and Supply, Demand Outlook of Trinidad Passenger Cars and Commercial Vehicles

Trinidad Passenger cars and commercial vehicles outlook report provides detailed research and outlook of automobile sector in Trinidad. Current market conditions, consumer preferences and key strategies of leading players in

USD 1249View Report

Trinidad & Tobago Telecommunications Strategic Analysis and Outlook to 2025- Analysis of Trinidad & Tobago Mobile, Fixed Telephone and Broadband Markets

Trinidad & Tobago Telecom outlook report is a comprehensive analytical research on the Trinidad & Tobagos cellular, fixed telephone and fixed broadband segments. Through detailed analysis of the current

USD 1350View Report

Nidco – Curepe Interchange Development – Trinidad and Tobago

Synopsis Nidco Curepe Interchange Development Trinidad and Tobago contains information on the scope of the project including project overview and location. The profile also details project ownership and funding,

USD 75View Report

Nidco – Curepe Interchange Development – Trinidad and Tobago

Synopsis Nidco Curepe Interchange Development Trinidad and Tobago contains information on the scope of the project including project overview and location. The profile also details project ownership and funding,

USD 75View Report

WASA – Arima Malabar Waste Water Treatment Plant – Trinidad and Tobago

Synopsis WASA Arima Malabar Waste Water Treatment Plant Trinidad and Tobago contains information on the scope of the project including project overview and location. The profile also details project

USD 75View Report

Menswear Market in Trinidad and Tobago to 2021 - Market Size, Development, and Forecasts

The report Menswear Market in Trinidad and Tobago to 2021 - Market Size, Development, and Forecasts offers the most up-to-date industry data on the actual market situation, and future outlook

USD 490View Report

Fill The Form For Sample Request
Name*
Email*
Mobile No.*
LandLine No.
Country Code.
If you want to purchase particular section from this report then kindly contact us at contact@aarkstore.com.

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    $ 1000
  • Site Licence    $ 1500
  • Enterprise Wide Licence    $ 3000
$ 1000

Reports Details

Published Date : Nov 2016
No. of Pages :21
Country :Trinidad and Tobago
Category :Alternative Energy
Publisher :GlobalData
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

payment
  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube