Market Research Reports and Industry Reports

Colombia Moqueta Project Panorama - Oil and Gas Upstream Analysis Report

  • DESCRIPTION
  • TABLE OF
    CONTENTS
  • RELATED
    REPORTS
  • SAMPLE REQUEST
  • PURCHASE BY
    SECTION
Colombia Moqueta Project Panorama - Oil and Gas Upstream Analysis Report

Summary

Colombia Moqueta Project Panorama, GlobalDatas latest release, presents a comprehensive overview of the asset. This upstream report includes detailed qualitative and quantitative information on the asset, provides a full economic assessment and reflects several parameters including (but not limited to) geological profile, asset development and specific challenges. Based on this analysis, future outlook for the asset is presented with possible trends and related scenarios identifying upside/downside potential.

Scope

- Overview of the asset based on an analysis of the economic indicators
- Key financial indicators including Net Present Value and Internal Rate of Return
- Review of factors affecting the economic outcome of the field including development overview, geology, challenges, reserves and production with qualitative perspective on of the overall assets life with GlobalDatas analysis on the assets future outlook
- Detailed production profile for the asset, giving annual output rates for each commodity produced
- Cash flow statements from our economic analysis of the asset including capital expenditures, operating expenditures and tax liability
- Individual valuations for equity holders
- Sensitivity analysis for asset value considering a range of factors

Reasons to buy

- Understand the economic and non-economic factors that affect production of an asset
- Benefit from an asset valuation derived from detailed research and modeling by our analysts
- Basic view of various scenarios and its effect on the asset for risk or strategy planning
- Utilize the quantitative and qualitative evaluation to ascertain trends within the region to inform decision making
- Identify economic trends of an asset to determine investment requirements
1.1 List of Tables 2
1.2 List of Figures 2
2 Project Panorama 3
3 Project Update 4
4 Outlook 5
5 Asset Summary 6
6 Development Overview 11
7 Geology 12
8 Challenges 13
9 Reserves and Production 14
10 Economic Analysis 16
11 Appendix 18
11.1 Contact Us 18
11.2 Disclaimer 18

List Of Tables

Table 1: Project Details 3
Table 2: Participation Overview 6
Table 3: Key Valuation Metrics 6
Table 4: Asset Valuation Metrics 8
Table 5: Cash Flow Summary 9
Table 6: State Take Summary 10
Table 7: Production Summary 15
Table 8: Production Data 15
Table 9: Project Cash Flow 16

List Of Figures

Figure 1: Annual Cash Flow 7
Figure 2: Full Cycle Expenditure And Revenue Split 7
Figure 3: Remaining Expenditure And Revenue Split 8
Figure 4: NPV Sensitivity 9
Figure 5: Percentage NPV Difference 10
Figure 6: Production 14

BC Transit – Victoria Regional Rapid Transit – British Colombia

Synopsis BC Transit Victoria Regional Rapid Transit British Colombia contains information on the scope of the project including project overview and location. The profile also details project ownership and

USD 75View Report

Multi-Family Housing Construction in Colombia to 2020: Market Databook

SynopsisTimetrics Multi-Family Housing Construction in Colombia to 2020: Market Databook contains detailed historic and forecast market value data for the multi-family housing construction industry, including a breakdown of the data

USD 500View Report

Single-Family Housing Construction in Colombia to 2020: Market Databook

SynopsisTimetrics Single-Family Housing Construction in Colombia to 2020: Market Databook contains detailed historic and forecast market value data for the single-family housing construction industry, including a breakdown of the data

USD 500View Report

Fill The Form For Sample Request
Name*
Email*
Mobile No.*
LandLine No.
Country Code.
If you want to purchase particular section from this report then kindly contact us at contact@aarkstore.com.

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

Discount on PDF and Enterprise Wide Licence reports
  • PDF    $ 1000
  • Site Licence    $ 1500
  • Enterprise Wide Licence    $ 3000
$ 1000

Reports Details

Published Date : Jun 2015
No. of Pages :18
Country :Colombia
Category :Energy and Power
Publisher :GlobalData
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

payment
  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube