Market Research Reports and Industry Reports

Nigeria Egina (PSC) Project Panorama - Oil and Gas Upstream Analysis Report

  • DESCRIPTION
  • TABLE OF
    CONTENTS
  • RELATED
    REPORTS
  • SAMPLE REQUEST
  • PURCHASE BY
    SECTION
Nigeria Egina (PSC) Project Panorama - Oil and Gas Upstream Analysis Report

Summary

Nigeria Egina (PSC) Project Panorama, GlobalDatas latest release, presents a comprehensive overview of the asset. This upstream report includes detailed qualitative and quantitative information on the asset, provides a full economic assessment and reflects several parameters including (but not limited to) geological profile, asset development and specific challenges. Based on this analysis, future outlook for the asset is presented with possible trends and related scenarios identifying upside/downside potential.

Scope

- Overview of the asset based on an analysis of the economic indicators
- Key financial indicators including Net Present Value and Internal Rate of Return
- Review of factors affecting the economic outcome of the field including development overview, geology, challenges, reserves and production with qualitative perspective on of the overall assets life with GlobalDatas analysis on the assets future outlook
- Detailed production profile for the asset, giving annual output rates for each commodity produced
- Cash flow statements from our economic analysis of the asset including capital expenditures, operating expenditures and tax liability
- Individual valuations for equity holders
- Sensitivity analysis for asset value considering a range of factors

Reasons to buy

- Understand the economic and non-economic factors that affect production of an asset
- Benefit from an asset valuation derived from detailed research and modeling by our analysts
- Basic view of various scenarios and its effect on the asset for risk or strategy planning
- Utilize the quantitative and qualitative evaluation to ascertain trends within the region to inform decision making
- Identify economic trends of an asset to determine investment requirements

1
2
2
2 Project Panorama 3
3 Project Update 4
4 Outlook 5
5 Asset Summary 6
6 Development Overview 11
7 Geology 13
8 Challenges 14
9 Reserves and Production 15
10 Economic Analysis 19
11 Appendix 23
11.1 Contact Us 23
11.2 Disclaimer 23

List Of Tables


Table 1: Project Details 3
Table 2: Participation Overview 6
Table 3: Key Valuation Metrics 6
Table 4: Asset Valuation Metrics 8
Table 5: Cash Flow Summary 9
Table 6: Fiscal Take Summary 9
Table 7: Production Summary 15
Table 8: Production Data 17
Table 9: Project Cash Flow 20

List Of Figures


Figure 1: Annual Cash Flow 7
Figure 2: Full Cycle Expenditure And Revenue Split 7
Figure 3: Remaining Expenditure And Revenue Split 8
Figure 4: NPV Sensitivity 9
Figure 5: Percentage NPV Difference 10
Figure 6: Production 15

MoWI – Lagos to Badagry Expressway Expansion – Nigeria Project Profile

Synopsis MoWI Lagos to Badagry Expressway Expansion Nigeria Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership

USD 75View Report

Sewage Infrastructure (Construction) in Nigeria: Market Analytics by Category & Cost Type to 2021

SynopsisTimetrics Sewage Infrastructure (Construction) in Nigeria: Market Analytics by Category & Cost Type to 2021 contains historic and forecast market data for the sewage infrastructure category in Nigeria, it also

USD 500View Report

Water Infrastructure (Construction) in Nigeria: Market Analytics by Category & Cost Type to 2021

SynopsisTimetrics Water Infrastructure (Construction) in Nigeria: Market Analytics by Category & Cost Type to 2021 contains historic and forecast market data for the water infrastructure category in Nigeria, it also

USD 500View Report

Nigeria Egina (RT) Project Panorama - Oil and Gas Upstream Analysis Report

Nigeria Egina (RT) Project Panorama - Oil and Gas Upstream Analysis ReportNigeria Egina (RT) Project Panorama, GlobalDatas latest release, presents a comprehensive overview of the asset. This upstream report includes

USD 1000View Report

Fill The Form For Sample Request
Name*
Email*
Mobile No.*
LandLine No.
Country Code.
If you want to purchase particular section from this report then kindly contact us at contact@aarkstore.com.

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    $ 1000
  • Site Licence    $ 1500
  • Enterprise Wide Licence    $ 3000
$ 1000

Reports Details

Published Date : Aug 2016
No. of Pages :23
Country :Nigeria
Category :Alternative Energy
Publisher :GlobalData
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

payment
  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube
paykasa bozdurma,paykasa bozdurma,astropay bozdurma,paykasa,paykasa,paykasa bozdurma,paykasa,astropay bozdurma,justin kart,bitcoin bozdurma,paykasa bozum,paykasa kart bozdurma,
beylikduzu escort,bahçeşehir escort,escort istanbul,
seo teknikleri wordpress ücretsiz tema istanbul sexs shop hacklink e sigara sexs shop