Market Research Reports and Industry Reports

Melbourne Water Werribee Western Treatment Plant Stage 2 Augmentation Victoria - Project Profile

  • DESCRIPTION
  • TABLE OF
    CONTENTS
  • RELATED
    REPORTS
  • SAMPLE REQUEST
  • REVIEWS

Synopsis


"Melbourne Water Werribee Western Treatment Plant Stage 2 Augmentation Victoria - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "Melbourne Water Werribee Western Treatment Plant Stage 2 Augmentation Victoria - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


The Melbourne Water Corporation (Melbourne Water) is undertaking the construction of Werribee Western Treatment Plant (WTP) Stage 2 Augmentation project in Victoria, Australia.

The project involves the construction of a sewage treatment plant with the capacity of 140 million liters of sewage per day.

The project is being implemented in two phases. The first phase includes the trial of three different technologies and approaches. The second phase includes the design and construction of a full-scale secondary sewage treatment plant at WTP, to be developed from the preferred treatment concept identified from the initial phase.

The project includes the upgrade of pumps, handling, and out-loading facilities, electrical and control systems, the installation of new screens to improve wet weather performance and the construction of other related facilities.

In December 2014, Melbourne Water selected three joint ventures to participate in the trial phase of upgrading the proposed project. The joint ventures are iN2ovate (a joint venture between John Holland, Aquatec-Maxcon and GHD Co); Organic Water (a joint venture between McConnell Dowell and DownerTenix, complemented by Organica Water, Inc. and CH2MHill); and Thiess-UGL-Jacobs joint venture.

The joint ventures will have an opportunity to optimize designs and mitigate risk, and for Melbourne Water to refine its requirements and gain a better understanding of viable solutions. All three joint ventures will be undertaking pilot plant trials and onsite testing.

The objective of this trial phase of the project is to select a preferred treatment technology for a plant upgrade of 140 million liters per day.

iN2ovate will study the potential of the Nereda waste water treatment technology of Royal HaskoningDHV for the proposed project.

Nereda is a cost-effective biological wastewater treatment technology based on a unique aerobic granular biomass, which is purifying bacteria that create compact granules with superb settling properties. It stands out for its high treatment capability in combination with significantly lower investment and operational costs, a very small footprint (up to a factor 4 smaller) and high energy savings of up to 50%.

The technology used by Organic Water and Thiess-UGL-Jacobs joint venture is yet to be revealed.

In May 2015, iN2ovate, Organic Water, and Thiess-UGL-Jacobs have established their trial plants at WTP and have commenced operation.

Over the 12 months time, they have collected analytical data and design information, to optimize their designs and mitigate risk. Simultaneously Melbourne Water started the process of refining its functional requirements and gains a better understanding of viable solutions.

In the early third quarter of 2016, Melbourne Water issued the tenders for the design-build contractor. A list of undisclosed companies has already submitted their bids.

On November 25, 2016, CPB Contractors, in a joint venture with UGL Ltd, was appointed as the design-build contractor. The joint venture will contribute design and construction techniques, and innovative environmental solutions, to deliver the second stage of the upgrade to the Western Treatment Plant, and to build a cost-efficient asset of ongoing value.

Pre-construction work is underway. Subject to the start of construction works, commissioning of the plant is expected by the fourth quarter of 2018 and following which the joint venture will undertake operations and maintenance of the plant for a period of up to two years to the end of 2020.

Stakeholder Information:

Planning Authority: Melbourne Water Corporation

Study Consultants: iN2ovate, Organic Water, and Thiess-UGL-Jacobs

Design-Build Contract: CPB Contractors, UGL Ltd

Scope


The WTP Stage 2 Augmentation project involves the construction of a sewage treatment plant with the capacity of 140 million liters of sewage per day in Werribee, Melbourne, Victoria, Australia.

The US$194 million project includes the following:

1. Upgrade of pumps
2. Upgrade of handling and out-loading facilities
3. Upgrade of electrical and control systems
4. Installation of new screens to improve wet weather performance
5. Construction other related facilities

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


.Key Statistics
2.Key Dates
3.Sector
4.Tender Information
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
0.General News, Project News
.Appendix


List Of Tables


.Key Statistics
2.Key Dates
3.Sector
4.Tender Information
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
0.General News, Project News
.Appendix


Melbourne Water – Werribee Western Treatment Plant Stage 2 Augmentation – Victoria - Project Profile

Synopsis Melbourne Water Werribee Western Treatment Plant Stage 2 Augmentation Victoria - Project Profile contains information on the scope of the project including project overview and location. The profile

USD 75View Report

VG/UoM – Melbourne Conservatorium of Music Expansion – Victoria - Project Profile

Synopsis VG/UoM Melbourne Conservatorium of Music Expansion Victoria - Project Profile contains information on the scope of the project including project overview and location. The profile also details project

USD 75View Report

Seqwater – Lake Macdonald Dam Upgrade – Queensland - Project Profile

Synopsis Seqwater Lake Macdonald Dam Upgrade Queensland - Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership

USD 75View Report

Haya Water – Misfah Sewage Treatment Plant – Muscat - Project Profile

Synopsis Haya Water Misfah Sewage Treatment Plant Muscat - Project Profile contains information on the scope of the project including project overview and location. The profile also details project

USD 75View Report

Fill The Form For Sample Request
Name*
Email*
Mobile No.*
LandLine No.
Country Code.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 75
  • Site Licence    USD 150
  • Enterprise Wide Licence    USD 225
$ 75

Reports Details

Published Date : Jun 2017
No. of Pages :8
Country :Australia
Category :Construction
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

payment
  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube