Market Research Reports and Industry Reports

PTPLN Riau-1 Coal-Fired Power Plant 600 MW Riau - Project Profile

  • DESCRIPTION
  • TABLE OF
    CONTENTS
  • RELATED
    REPORTS
  • SAMPLE REQUEST
  • REVIEWS

Synopsis


"PTPLN Riau-1 Coal-Fired Power Plant 600 MW Riau - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "PTPLN Riau-1 Coal-Fired Power Plant 600 MW Riau - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


Perusahaan Listrik Negara (PT PLN) is planning to build a coal-fired power plant in Riau, Sumatera, Indonesia.

The project involves the construction of a 600MW (2 X 300MW) coal-fired power plant. It includes the construction of substations, powerhouses, an administrative space, related infrastructure, the installation of generators and turbines, and the laying of transmission lines.

BlackGold Natural Resources Limited (BlackGold) will have a stake of 44% and China Huadian Engineering Co., Ltd (CHE) will have a stake of 51% and the remaining five percent will be a third partner.

In June 2010, PT PLN invited the bids for first pre-qualification process.

In October 2010, an invitation for bids for the second pre-qualification process was held.

In June 2017, PT PLN has awarded a construction contract to the NewCo a joint venture formed by PT Samantaka Batubara (PT SB) a subsidiary of BlackGold and CHE.

On June 8, 2017, PT SB and CHE signed a conditional term sheet to develop the project.

Construction is expected to be completed by 2020.

Scope


The Riau 1 Coal-Fired power plant project involves the construction of a 600MW (2 X 300MW) coal-fired power plant in Riau, Sumatera, Indonesia.

The US$900 million project includes the following:

1. Construction of substations
2. Construction of powerhouses
3. Construction of an administrative space
4. Installation of generators and turbines
5. Laying of transmission lines
6. Construction of related infrastructure

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
0.Key Contacts
.General News, Project News
2.Appendix


List Of Tables


.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
0.Key Contacts
.General News, Project News
2.Appendix


PTPLN – Riau-1 Coal-Fired Power Plant 600 MW – Riau - Project Profile

Synopsis PTPLN Riau-1 Coal-Fired Power Plant 600 MW Riau - Project Profile contains information on the scope of the project including project overview and location. The profile also details

USD 75View Report

PTPLN – Sumbagut II Peaker Power Plant 240 MW – Aceh - Project Profile

Synopsis PTPLN Sumbagut II Peaker Power Plant 240 MW Aceh - Project Profile contains information on the scope of the project including project overview and location. The profile also

USD 75View Report

PTPLN – Sumbagut II Peaker Power Plant 240 MW – Aceh - Project Profile

Synopsis PTPLN Sumbagut II Peaker Power Plant 240 MW Aceh - Project Profile contains information on the scope of the project including project overview and location. The profile also

USD 75View Report

Fill The Form For Sample Request
Name*
Email*
Mobile No.*
LandLine No.
Country Code.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 75
  • Site Licence    USD 150
  • Enterprise Wide Licence    USD 225
$ 75

Reports Details

Published Date : Jun 2017
No. of Pages :6
Country :Indonesia
Category :Construction
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

payment
  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube