Market Research Reports and Industry Reports

NVA E18 Rugtvedt to Drdal Road Development Telemark - Project Profile

  • DESCRIPTION
  • TABLE OF
    CONTENTS
  • RELATED
    REPORTS
  • SAMPLE REQUEST
  • REVIEWS

Synopsis


"NVA E18 Rugtvedt to Drdal Road Development Telemark - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "NVA E18 Rugtvedt to Drdal Road Development Telemark - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


Nye Veier AS (NVA) is undertaking the construction of a road in Bamble, Telemark, Norway.

The project involves the construction of an 18km four-lane road on E18 between Rugtvedt and Drdal.

It Includes the construction of 16.8km four-lane road from Rugtvedt to Drdal besides Intrusion existing E18; a 1.2 km two-lane road for interconnection with the current road; 10 bridges with a length 0.45km; six transitional bridges; four environmental tunnels (Rugtvedttunnelen (121m), Vardstunnelen (70m), Langrnningtunnelen (60m), Lille Langrnningtunnelen (62m)); four culverts; and the installation of safety and security systems, and signalling systems.

Multiconsult AS has been appointed as the lead consultant and ARC Arkitekter AS as sub-consultant.

On December 22, 2015, NVA and Norwegian Public Roads Administration (NPRA) signed an agreement for the development of the project.

On June 10, 2016, NVA issued a notice of turnkey competition (NTC) for the design, build, operate and maintain (DBOM) contract with a submission deadline on August 16, 2016.

On August 16, 2016, NVA received eligibility request from 10 companies for NTC to build the project.

In September 2016, NVA selected four pre-qualified bidders they are Hhre entreprenr AS, Veidekke Entreprenr AS with the AF Group, NCC Norge AS and Acciona Infrastructure.

The project is being implemented as BVP (Best Value Procurement) competition which conducted in collaboration with DIFI (Agency for Public Management and eGovernment).

On August 31, 2016, NVA issued tender for the site preparation work (SPW) contract with a submission deadline on October 10, 2016.

On October 13, 2016, NVA awarded SPW contract to Marthinsen &Duvholt AS includes deforestation and construction of access roads LKL 3 in connection with the construction of the road on E18 between Rugtvedt-Drdal.

In February 2017, NVA has selected Hhre Entreprenr AS as the contractor for the US$215 million construction works of the project.

On May 10, 2017, NVA signed an agreement with Hhre Entreprenr AS for DBOM contract. Hhre Entreprenr AS appointed COWI AS as the design consultant.

In June 2017, Hhre Entreprenr AS appointed PNC Norge (PORR AG) as concrete structures sub-contractor.

Construction work on the road is expected to start in August 2017 and completed by December 2019.

Scope


The project involves the construction of an 18km four-lane road on E18 between Rugtvedt and Drdal in Bamble, Telemark, Norway.

The US$543 million project includes the following:

1. Construction of 16.8km four-lane road from Rugtvedt to Drdal besides Intrusion existing E18
2. Construction of a 1.2 km two-lane road for interconnection with the current road
3. Construction of 10 bridges with a length of 0.45km
4. Construction of four environmental tunnels
5. Construction of six transitional bridges
6. Construction of four culverts
7. Installation of safety and security systems
8. Installation of signalling systems

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
0.Key Contacts
.General News, Project News
2.Appendix


List Of Tables


.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
0.Key Contacts
.General News, Project News
2.Appendix


Global Minimally Invasive Surgical Instruments Market Research Report 2017

In this report, the global Minimally Invasive Surgical Instruments market is valued at USD XX million in 2016 and is expected to reach USD XX million by the end of

USD 2900View Report

Global Non-Invasive Glucose Monitoring Market Professional Survey Report 2017

This report studies Non-Invasive Glucose Monitoring in Global market, especially in North America, China, Europe, Southeast Asia, Japan and India, with production, revenue, consumption, import and export in these regions,

USD 3500View Report

NPRA – E18 Retvet to Vinterbro Road Development – Oslo Project Profile

Synopsis NPRA E18 Retvet to Vinterbro Road Development Oslo Project Profile contains information on the scope of the project including project overview and location. The profile also details project

USD 75View Report

NPRA – E18 Retvet to Vinterbro Road Development – Oslo - Construction Project Profile

Synopsis NPRA E18 Retvet to Vinterbro Road Development Oslo - Construction Project Profile contains information on the scope of the project including project overview and location. The profile also

USD 75View Report

Fill The Form For Sample Request
Name*
Email*
Mobile No.*
LandLine No.
Country Code.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 75
  • Site Licence    USD 150
  • Enterprise Wide Licence    USD 225
$ 75

Reports Details

Published Date : Jun 2017
No. of Pages :8
Country :Norway
Category :Construction
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

payment
  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube