Market Research Reports and Industry Reports

RTE Saint-Nazaire Offshore Wind Farm Electrical Transmission Connection Line Pays de la Loire - Project Profile

  • DESCRIPTION
  • TABLE OF
    CONTENTS
  • RELATED
    REPORTS
  • SAMPLE REQUEST
  • REVIEWS

Synopsis


"RTE Saint-Nazaire Offshore Wind Farm Electrical Transmission Connection Line Pays de la Loire - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "RTE Saint-Nazaire Offshore Wind Farm Electrical Transmission Connection Line Pays de la Loire - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


Rseau de Transport dElectricit (RTE) is planning to develop an electrical transmission line between the Saint-Nazaire offshore wind farm and Prinquiau in France.

The project involves the construction of 61km of 220kv subsea and underground cable transmission line. It includes the laying of two pairs of 220kv submarine cables of 33km in length, and two pairs of 220kv underground cables of 28km in length, the construction of a 220kv substation at Prinquiau on a 5ha area, a connection junction between submarine and underground cables, and the installation of transformers and equipment.

TBM Environnement was appointed as a Environmental study consultant.

The public inquiry process was completed.

In the first quarter of 2017, Prysmian, a specialist in cable systems for energy and telecommunications, won a contract from RTE to design and supply submarine interconnection cables (the submarine cable links will include high voltage alternating current (HVAC) 220kV three-core cables with cross linked polyethylene (XLPE) insulation and single wire armoring) to connect the three offshore wind farm project: Fcamp (498MW) in Seine-Maritime, Courseulles-sur-Mer (450MW) in Calvados, and Saint-Nazaire (480MW) in the Loire-Atlantique region, to the countrys mainland grid.

Construction is expected to commence in the fourth quarter of 2017.

Site preparation activities are underway.

Scope


The project involves the construction of a 61km long 220kv submarine and underground transmission line between Saint-Nazaire off-shore wind farm and Prinquiau in France.

The US$332 million project includes the following:

1. Laying of 33km long 220kv submarine transmission line
2. Laying of 28km long 220kv underground transmission line
3. Construction of 220kv substation at Prinquiau on a 5ha area
4. Construction of a connection junction between submarine cables and underground cables
5. Installation of transformers
6. Installation of controls systems
7. Installation of equipment

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
0.Key Contacts
.General News, Project News
2.Appendix


List Of Tables


.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
0.Key Contacts
.General News, Project News
2.Appendix


Global Solar Hybrid Inverter Market Professional Survey Report 2017

This report studies Solar Hybrid Inverter in Global market, especially in North America, China, Europe, Southeast Asia, Japan and India, with production, revenue, consumption, import and export in these regions,

USD 3500View Report

Asia-Pacific Renal Artery Stent Market Report 2017

In this report, the Asia-Pacific Renal Artery Stent market is valued at USD XX million in 2016 and is expected to reach USD XX million by the end of 2022,

USD 4000View Report

NG/RTE – France-Britain IFA2 Electrical Interconnection – United Kingdom - Project Profile

Synopsis NG/RTE France-Britain IFA2 Electrical Interconnection United Kingdom - Project Profile contains information on the scope of the project including project overview and location. The profile also details project

USD 75View Report

RTE – Courseulles-sur-mer Offshore Wind Farm Electrical Transmission Connection Line – Basse-Normandie - Project Profile

Synopsis RTE Courseulles-sur-mer Offshore Wind Farm Electrical Transmission Connection Line Basse-Normandie - Project Profile contains information on the scope of the project including project overview and location. The profile

USD 75View Report

Fill The Form For Sample Request
Name*
Email*
Mobile No.*
LandLine No.
Country Code.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 75
  • Site Licence    USD 150
  • Enterprise Wide Licence    USD 225
$ 75

Reports Details

Published Date : Jul 2017
No. of Pages :7
Country :France
Category :Construction
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

payment
  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube