Synopsis


"GDCM Precinct Gas District Cooling Plant 1 Putrajaya - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "GDCM Precinct Gas District Cooling Plant 1 Putrajaya - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


Gas District Cooling (Putrajaya) Sdn Bhd (GDCM) is undertaking the construction of a gas district cooling plant in Putrajaya, Malaysia.

The project involves the construction of gas district cooling plant. It includes the construction of an industrial building for water freezing system, a power house, a new Annex 2 building, an administrative facility, and the installation of steam absorption chillers, electrical centrifugal chillers, cooling towers, an auxiliary gas boiler, chilled water piping at Plot Z2 to Z8, a thermal energy storage tank, a heat recovery steam generator, a fuel gas compressor, a gas turbine generator and its auxiliary system, and laying of pipelines to supply chilled water and laying of transmission lines.

The Chilled Water Supply system includes two sections, Section 1 from plant to Parcel Z and section 2 from plant to Parcel F.

On March 24, 2017, Sunway Construction Sdn Bhd (SCSB), a subsidiary of Sunway Group Construction Bhds (SunCon) received a letter of award from GDCM for the engineering, procurement, construction and commissioning (EPCC) contract.

Pre-construction activities are underway and the construction is slated to be completed in August 2018.

Scope


The project involves the construction of a gas district cooling (GDC) plant in Precinct 1, Putrajaya, Malaysia.

The US$40 million project includes the following:

1. Construction of an industrial building for water freezing system
2. Construction of a power house
3. Construction of an administrative facility
4. Construction of a new Annex 2 building
4. Installation of steam absorption chillers
5. Installation of electrical centrifugal chillers
6. Installation of cooling towers
7. Installation of an auxiliary gas boiler
8. Installation of chilled water piping at Plot Z2 to Z8
9. Installation of a thermal energy storage tank
10. Installation of a heat recovery steam generator
11. Installation of a fuel gas compressor
12. Installation of gas turbine generator and its auxiliary system
13. Laying of pipelines to supply chilled water
14. Laying of transmission lines

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.


.Key Statistics
2.Key Dates
3.Sector
4.Tender Information
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
0.Appendix


List Of Tables


.Key Statistics
2.Key Dates
3.Sector
4.Tender Information
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
0.Appendix


GDCM – Precinct Gas District Cooling Plant 1 – Putrajaya - Project Profile

Synopsis GDCM Precinct Gas District Cooling Plant 1 Putrajaya - Project Profile contains information on the scope of the project including project overview and location. The profile also details

USD 75View Report

Fill The Form For Sample Request
Name*
Email*
Mobile No.*
LandLine No.
Country Code.
There is no Reviews available

Delivery Details

PDF FORMAT REPORTS will be delivered by email within 12 to 24 hours after placing the order (Mon-Fri IST)

CHOOSE FORMAT

  • PDF    USD 75
  • Site Licence    USD 150
  • Enterprise Wide Licence    USD 225
$ 75

Reports Details

Published Date : Jul 2017
No. of Pages :6
Country :Malaysia
Category :Construction
Publisher :Timetric
Report Delivery By :Email
Report Delivery Time :12 to 24 hours after placing the order.

Customized Research

If you do not find this specific report suitable to your exact needs then you can also opt for customized research report that will befit all your expectation. To specify your requirements CLICK HERE

 

We Accept

payment
  • fb
  • twitter
  • pinterest
  • linckedin
  • rss
  • youtube